PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Metal furring Stair -2 Shear Walls Facing West.jpg Exterior metal framing the 4th floor Facing East.jpg Installed duct work raiser at the 4th floor Facing North.jpg Laying out block at the 1st Floor Attorneys Room Facing East.jpg
Previous pageNext page Installed duct work raiser at the 4th floor Facing North
Installed duct work raiser at the 4th floor Facing North